Winterbourne Underpass

Winterbourne Underpass

Bristol, United Kingdom
A critical overpass in Bristol, United Kingdom
Owner: Highways England
Consultant: Atkin Engineering
Contractor: CRL

The M4 Bridge carries the M4 over Winterbourne Lane spanning over a two lane road.

The Problem

The M4 Bridge at Winterbourne Lane needed repairs and upgrading. The bridge had suffered from water damage in recent years, and the deck needed replacing. Water was leaking from the top of the bridge deck surface, which had caused corrosion to the underside of the underbridge.

Our Solution

The works needed to be carried out to ensure that section of the M4 remained safe. Survey and investigation work including half-cell tests were completed revealing some areas of high chloride levels. Atkins Engineering Consultants selected a design to use drilled-in Galvashield® CC anodes in these areas to protect the structure for the future.

The Result

Contractor CRL installed the anodes and completed the concrete repairs in 2015. The Galvashield CC anodes allow owners and engineers to maintain the integrity of the structure while avoiding costly repairs because they can be installed within sound concrete. This saves labor and time while also keeping waste materials at a minimum. 

Technology Used

These innovative products and technologies were used on this project. 

 

1 Technology
We use cookies to ensure you get the best experience on our website. By using this site, you agree to these cookies being set. To learn more, read our privacy policy.
View policyOk